Two-Story Masonry Building Strenghthened
with Fiber Reinforced Polymer (FRP)
Redwood City, California
This
two-story building is located in downtown Redwood City, south of San Francisco.
The neighboring property had excavated the lot and the owners of this
building were concerned about the stability of the exposed wall during
construction.
The masonry wall (about 40-ft high x 70-ft long) was retrofitted with
glass fabric. The contractor chose to install the fabric in horizontal
strips with 6-in. overlap along the length of the wall. A crew of 3 workers
finished this installation in roughly 4 days.
The project was completed in August 1997.
Credits
Structural Engineer: The Crosby Group, Redwood City, CA
Contractor: Watertight Restoration, Inc., Redwood City, CA
|